Sewage Infrastructure Construction Market in Cameroon - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

Sewage Infrastructure Construction Market in Cameroon - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

Summary

The sewage infrastructure construction sector in Cameroon registered a positive Compound Annual Growth Rate (CAGR) of 11.41% during the period 2017 to 2021 with an output value of XAF97,451.92 million in 2021, an increase of9.41% over 2020. The sector achieved its strongest performance in 2019 when it grew by 18.54% over the previous year and its weakest performance in 2020, when it decreased by 2.77% over 2019.

Sewage Infrastructure Construction Market in Cameroon - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Sewage Infrastructure construction market in Cameroon.

Facilities that collect and treat waste and sewage. This includes, but is not limited to, drainage systems, septic tanks, sewer pipes and pumping stations, disposal plants and treatment facilities. .

This research handbook provides historic and forecast market data for the Sewage Infrastructure construction market in Cameroon, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026.

This report also provides a top-level overview and detailed insight into the operating environment of the Sewage Infrastructure construction market in Cameroon. It is an essential tool for companies active across the Cameroon construction value chain and for new players considering to enter the market.

Values in the handbook are depicted in USD ($) and local currency of the country.

NoteCertain content / sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope

  • Overview of the sewage infrastructure construction market in Cameroon.
  • Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided.
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the sewage infrastructure market and the data is provided for both historic and forecast periods.
Reasons to Buy
  • Enhances your knowledge of the market with key figures detailing construction type.
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
  • Allows you to plan future business decisions using the forecast figures given.
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.


1 Executive Summary
2 Sewage Infrastructure Construction: Market Analytics
2.1 Sewage Infrastructure Construction Output Value, 2017 - 2021
2.2 Sewage Infrastructure Construction Output Value Forecast, 2021 - 2026
2.3 Sewage Infrastructure Construction Output, by Cost Component
2.3.1 Sewage Infrastructure Construction Output, by Cost Component, 2017 - 2021
2.3.2 Sewage Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
3 Sewage Infrastructure Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 – 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About GlobalData
4.6 Disclaimer
List of Tables
Table 1: Cameroon Sewage Infrastructure Construction Output Value (XAF Million), 2017 - 2021
Table 2: Cameroon Sewage Infrastructure Construction Output Value (US$ Million), 2017 - 2021
Table 3: Cameroon Sewage Infrastructure Construction Output Value (XAF Million), 2021 - 2026
Table 4: Cameroon Sewage Infrastructure Construction Output Value (US$ Million), 2021 - 2026
Table 5: Cameroon Sewage Infrastructure Construction Output, by Cost Component (XAF Million), 2017 – 2021
Table 6: Cameroon Sewage Infrastructure Construction Output, by Cost Component (US$ Million), 2017 – 2021
Table 7: Cameroon Sewage Infrastructure Construction Output, by Cost Component (XAF Million), 2022 - 2026
Table 8: Cameroon Sewage Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 9: Cameroon Sewage Infrastructure Construction Output Value, New Construction (XAF Million), 2017 - 2021
Table 10: Cameroon Sewage Infrastructure Construction Output Value, New Construction (US$ Million), 2017 - 2021
Table 11: Cameroon Sewage Infrastructure Construction Output Value, New Construction (XAF Million), 2021- 2026
Table 12: Cameroon Sewage Infrastructure Construction Output Value, New Construction (US$ Million), 2021- 2026
Table 13: Cameroon Sewage Infrastructure Construction Output, New Construction by Cost Component (XAF Million), 2017 - 2021
Table 14: Cameroon Sewage Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2017 - 2021
Table 15: Cameroon Sewage Infrastructure Construction Output, New Construction by Cost Component (XAF Million), 2022 - 2026
Table 16: Cameroon Sewage Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2022 - 2026
Table 17: Cameroon Sewage Infrastructure Construction Output Value, Repair and Maintenance (XAF Million), 2017 - 2021
Table 18: Cameroon Sewage Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2017 - 2021
Table 19: Cameroon Sewage Infrastructure Construction Output Value, Repair and Maintenance (XAF Million), 2021 – 2026
Table 20: Cameroon Sewage Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2021 - 2026
Table 21: Cameroon Sewage Infrastructure Construction Output, Repair and Maintenance by Cost Component (XAF Million), 2017 - 2021
Table 22: Cameroon Sewage Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2017 - 2021
Table 23: Cameroon Sewage Infrastructure Construction Output, Repair and Maintenance by Cost Component (XAF Million), 2022 – 2026
Table 24: Cameroon Sewage Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2022 – 2026
Table 25: Cameroon Sewage Infrastructure Construction Output Value, Refurbishment (XAF Million), 2017 - 2021
Table 26: Cameroon Sewage Infrastructure Construction Output Value, Refurbishment (US$ Million), 2017 - 2021
Table 27: Cameroon Sewage Infrastructure Construction Output Value, Refurbishment (XAF Million), 2021 - 2026
Table 28: Cameroon Sewage Infrastructure Construction Output Value, Refurbishment (US$ Million), 2021- 2026
Table 29: Cameroon Sewage Infrastructure Construction Output, Refurbishment by Cost Component (XAF Million), 2017 - 2021
Table 30: Cameroon Sewage Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2017 - 2021
Table 31: Cameroon Sewage Infrastructure Construction Output, Refurbishment by Cost Component (XAF Million), 2022 - 2026
Table 32: Cameroon Sewage Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2022 - 2026
Table 33: Cameroon Sewage Infrastructure Construction Output Value, Demolition (XAF Million), 2017 - 2021
Table 34: Cameroon Sewage Infrastructure Construction Output Value, Demolition (US$ Million), 2017 - 2021
Table 35: Cameroon Sewage Infrastructure Construction Output Value, Demolition (XAF Million), 2021 - 2026
Table 36: Cameroon Sewage Infrastructure Construction Output Value, Demolition (US$ Million), 2021 - 2026
Table 37: Cameroon Sewage Infrastructure Construction Output, Demolition by Cost Component (XAF Million), 2017 - 2021
Table 38: Cameroon Sewage Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2017 - 2021
Table 39: Cameroon Sewage Infrastructure Construction Output, Demolition by Cost Component (XAF Million), 2022 - 2026
Table 40: Cameroon Sewage Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2022 - 2026
Table 41: GlobalData – Sewage Infrastructure Construction Market Definitions
Table 42: Exchange Rate, 2017 - 2021
Table 43: Exchange Rate, 2022 - 2026 Forecast
List of Figures
Figure 1: Cameroon Sewage Infrastructure Construction Output Value (XAF Million), 2017 – 2021
Figure 2: Cameroon Sewage Infrastructure Construction Output Value (XAF Million), 2021 – 2026
Figure 3: Cameroon Sewage Infrastructure Construction Output, by Cost Component (XAF Million), 2017 - 2021
Figure 4: Cameroon Sewage Infrastructure Construction Output, by Cost Component (XAF Million), 2022 - 2026
Figure 5: Cameroon Sewage Infrastructure Construction Output Value, New Construction (XAF Million), 2017 - 2021
Figure 6: Cameroon Sewage Infrastructure Construction Output Value, New Construction (XAF Million), 2021 - 2026
Figure 7: Cameroon Sewage Infrastructure Construction Output, New Construction by Cost Component (XAF Million), 2017 - 2021
Figure 8: Cameroon Sewage Infrastructure Construction Output, New Construction by Cost Component (XAF Million), 2022 - 2026
Figure 9: Cameroon Sewage Infrastructure Construction Output Value, Repair and Maintenance (XAF Million), 2017 - 2021
Figure 10: Cameroon Sewage Infrastructure Construction Output Value, Repair and Maintenance (XAF Million), 2021- 2026
Figure 11: Cameroon Sewage Infrastructure Construction Output, Repair and Maintenance by Cost Component (XAF Million), 2017 - 2021
Figure 12: Cameroon Sewage Infrastructure Construction Output, Repair and Maintenance by Cost Component (XAF Million), 2022 – 2026
Figure 13: Cameroon Sewage Infrastructure Construction Output Value, Refurbishment (XAF Million), 2017 - 2021
Figure 14: Cameroon Sewage Infrastructure Construction Output Value, Refurbishment (XAF Million), 2021- 2026
Figure 15: Cameroon Sewage Infrastructure Construction Output, Refurbishment by Cost Component (XAF Million), 2017 - 2021
Figure 16: Cameroon Sewage Infrastructure Construction Output, Refurbishment by Cost Component (XAF Million), 2022 - 2026
Figure 17: Cameroon Sewage Infrastructure Construction Output Value, Demolition (XAF Million), 2017 - 2021
Figure 18: Cameroon Sewage Infrastructure Construction Output Value, Demolition (XAF Million), 2021 - 2026
Figure 19: Cameroon Sewage Infrastructure Construction Output, Demolition by Cost Component (XAF Million), 2017 - 2021
Figure 20: Cameroon Sewage Infrastructure Construction Output, Demolition by Cost Component (XAF Million), 2022 - 2026

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook
Cookie Settings