Road Infrastructure Construction Market in Azerbaijan - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

Road Infrastructure Construction Market in Azerbaijan - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

Summary

The road infrastructure construction sector in Azerbaijan registered a Compound Annual Rate of Change (CARC) of -4.34% during the period 2017 to 2021 with an output value of AZN3,575.37 million in 2021, a decrease of 3.09% over 2020. The sector achieved its strongest performance in 2017 when it grew by 27.01% over the previous year and its weakest performance in 2019, when it decreased by 14.27% over 2018. Road Infrastructure Construction Market in Azerbaijan - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Road Infrastructure construction market in Azerbaijan.Includes, but is not limited to, highways, causeways, streets, parkways, pavements, underpasses, flyovers and overpasses, road bridges and road tunnels. . This research handbook provides historic and forecast market data for the Road Infrastructure construction market in Azerbaijan, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026. This report also provides a top-level overview and detailed insight into the operating environment of the Road Infrastructure construction market in Azerbaijan. It is an essential tool for companies active across the Azerbaijan construction value chain and for new players considering to enter the market.Values in the handbook are depicted in USD ($) and local currency of the country.*Note: Certain content / sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope

  • Overview of the road infrastructure construction market in Azerbaijan.
  • Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided.
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the road infrastructure market and the data is provided for both historic and forecast periods.
Reasons to Buy
  • Enhances your knowledge of the market with key figures detailing construction type.
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
  • Allows you to plan future business decisions using the forecast figures given.
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.


1 Executive Summary
2 Road Infrastructure Construction: Market Analytics
2.1 Road Infrastructure Construction Output Value, 2017 - 2021
2.2 Road Infrastructure Construction Output Value Forecast, 2021 - 2026
2.3 Road Infrastructure Construction Output, by Cost Component
2.3.1 Road Infrastructure Construction Output, by Cost Component, 2017 - 2021
2.3.2 Road Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
3 Road Infrastructure Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 - 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About GlobalData
4.6 Disclaimer
1 Executive Summary
2 Road Infrastructure Construction: Market Analytics
2.1 Road Infrastructure Construction Output Value, 2017 - 2021
2.2 Road Infrastructure Construction Output Value Forecast, 2021 - 2026
2.3 Road Infrastructure Construction Output, by Cost Component
2.3.1 Road Infrastructure Construction Output, by Cost Component, 2017 - 2021
2.3.2 Road Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
3 Road Infrastructure Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 - 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About GlobalData
4.6 Disclaimer
List of Figures
Figure 1: Azerbaijan Road Infrastructure Construction Output Value (AZN Million), 2017 - 2021
Figure 2: Azerbaijan Road Infrastructure Construction Output Value (AZN Million), 2021 - 2026
Figure 3: Azerbaijan Road Infrastructure Construction Output, by Cost Component (AZN Million), 2017 - 2021
Figure 4: Azerbaijan Road Infrastructure Construction Output, by Cost Component (AZN Million), 2022 - 2026
Figure 5: Azerbaijan Road Infrastructure Construction Output Value, New Construction (AZN Million), 2017 - 2021
Figure 6: Azerbaijan Road Infrastructure Construction Output Value, New Construction (AZN Million), 2021 - 2026
Figure 7: Azerbaijan Road Infrastructure Construction Output, New Construction by Cost Component (AZN Million), 2017 - 2021
Figure 8: Azerbaijan Road Infrastructure Construction Output, New Construction by Cost Component (AZN Million), 2022 - 2026
Figure 9: Azerbaijan Road Infrastructure Construction Output Value, Repair and Maintenance (AZN Million), 2017 - 2021
Figure 10: Azerbaijan Road Infrastructure Construction Output Value, Repair and Maintenance (AZN Million), 2021- 2026
Figure 11: Azerbaijan Road Infrastructure Construction Output, Repair and Maintenance by Cost Component (AZN Million), 2017 - 2021
Figure 12: Azerbaijan Road Infrastructure Construction Output, Repair and Maintenance by Cost Component (AZN Million), 2022 - 2026
Figure 13: Azerbaijan Road Infrastructure Construction Output Value, Refurbishment (AZN Million), 2017 - 2021
Figure 14: Azerbaijan Road Infrastructure Construction Output Value, Refurbishment (AZN Million), 2021- 2026
Figure 15: Azerbaijan Road Infrastructure Construction Output, Refurbishment by Cost Component (AZN Million), 2017 - 2021
Figure 16: Azerbaijan Road Infrastructure Construction Output, Refurbishment by Cost Component (AZN Million), 2022 - 2026
Figure 17: Azerbaijan Road Infrastructure Construction Output Value, Demolition (AZN Million), 2017 - 2021
Figure 18: Azerbaijan Road Infrastructure Construction Output Value, Demolition (AZN Million), 2021 - 2026
Figure 19: Azerbaijan Road Infrastructure Construction Output, Demolition by Cost Component (AZN Million), 2017 - 2021
Figure 20: Azerbaijan Road Infrastructure Construction Output, Demolition by Cost Component (AZN Million), 2022 - 2026

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook
Cookie Settings