Rail Infrastructure Construction Market in Australia - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

Rail Infrastructure Construction Market in Australia - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

Summary

The rail infrastructure construction sector in Australia registered a positive Compound Annual Growth Rate (CAGR) of 19.30% during the period 2017 to 2021 with an output value of AUD11,861.32 million in 2021, an increase of21.89% over 2020. The sector achieved its strongest performance in 2017 when it grew by 46.06% over the previous year and its weakest performance in 2019, when it decreased by 2.93% over 2018.

Rail Infrastructure Construction Market in Australia - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Rail Infrastructure construction market in Australia.

Facilities that serve the railway system. This includes, but is not limited to, rail bridges, railway stations, terminals, rail buildings, rail tunnels and rail tracks. .

This research handbook provides historic and forecast market data for the Rail Infrastructure construction market in Australia, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026.

This report also provides a top-level overview and detailed insight into the operating environment of the Rail Infrastructure construction market in Australia. It is an essential tool for companies active across the Australia construction value chain and for new players considering to enter the market.

Values in the handbook are depicted in USD ($) and local currency of the country.

*Note: Certain content / sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope

  • Overview of the rail infrastructure construction market in Australia.
  • Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided.
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the rail infrastructure market and the data is provided for both historic and forecast periods.
Reasons to Buy
  • Enhances your knowledge of the market with key figures detailing construction type.
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
  • Allows you to plan future business decisions using the forecast figures given.
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.


1 Executive Summary
2 Rail Infrastructure Construction: Market Analytics
2.1 Rail Infrastructure Construction Output Value, 2017 - 2021
2.2 Rail Infrastructure Construction Output Value Forecast, 2021 - 2026
2.3 Rail Infrastructure Construction Output, by Cost Component
2.3.1 Rail Infrastructure Construction Output, by Cost Component, 2017 - 2021
2.3.2 Rail Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
3 Rail Infrastructure Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 - 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About GlobalData
4.6 Disclaimer
List of Tables
Table 1: Australia Rail Infrastructure Construction Output Value (AUD Million), 2017 - 2021
Table 2: Australia Rail Infrastructure Construction Output Value (US$ Million), 2017 - 2021
Table 3: Australia Rail Infrastructure Construction Output Value (AUD Million), 2021 - 2026
Table 4: Australia Rail Infrastructure Construction Output Value (US$ Million), 2021 - 2026
Table 5: Australia Rail Infrastructure Construction Output, by Cost Component (AUD Million), 2017 - 2021
Table 6: Australia Rail Infrastructure Construction Output, by Cost Component (US$ Million), 2017 - 2021
Table 7: Australia Rail Infrastructure Construction Output, by Cost Component (AUD Million), 2022 - 2026
Table 8: Australia Rail Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 9: Australia Rail Infrastructure Construction Output Value, New Construction (AUD Million), 2017 - 2021
Table 10: Australia Rail Infrastructure Construction Output Value, New Construction (US$ Million), 2017 - 2021
Table 11: Australia Rail Infrastructure Construction Output Value, New Construction (AUD Million), 2021- 2026
Table 12: Australia Rail Infrastructure Construction Output Value, New Construction (US$ Million), 2021- 2026
Table 13: Australia Rail Infrastructure Construction Output, New Construction by Cost Component (AUD Million), 2017 - 2021
Table 14: Australia Rail Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2017 - 2021
Table 15: Australia Rail Infrastructure Construction Output, New Construction by Cost Component (AUD Million), 2022 - 2026
Table 16: Australia Rail Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2022 - 2026
Table 17: Australia Rail Infrastructure Construction Output Value, Repair and Maintenance (AUD Million), 2017 - 2021
Table 18: Australia Rail Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2017 - 2021
Table 19: Australia Rail Infrastructure Construction Output Value, Repair and Maintenance (AUD Million), 2021 - 2026
Table 20: Australia Rail Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2021 - 2026
Table 21: Australia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (AUD Million), 2017 - 2021
Table 22: Australia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2017 - 2021
Table 23: Australia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (AUD Million), 2022 - 2026
Table 24: Australia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2022 - 2026
Table 25: Australia Rail Infrastructure Construction Output Value, Refurbishment (AUD Million), 2017 - 2021
Table 26: Australia Rail Infrastructure Construction Output Value, Refurbishment (US$ Million), 2017 - 2021
Table 27: Australia Rail Infrastructure Construction Output Value, Refurbishment (AUD Million), 2021 - 2026
Table 28: Australia Rail Infrastructure Construction Output Value, Refurbishment (US$ Million), 2021- 2026
Table 29: Australia Rail Infrastructure Construction Output, Refurbishment by Cost Component (AUD Million), 2017 - 2021
Table 30: Australia Rail Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2017 - 2021
Table 31: Australia Rail Infrastructure Construction Output, Refurbishment by Cost Component (AUD Million), 2022 - 2026
Table 32: Australia Rail Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2022 - 2026
Table 33: Australia Rail Infrastructure Construction Output Value, Demolition (AUD Million), 2017 - 2021
Table 34: Australia Rail Infrastructure Construction Output Value, Demolition (US$ Million), 2017 - 2021
Table 35: Australia Rail Infrastructure Construction Output Value, Demolition (AUD Million), 2021 - 2026
Table 36: Australia Rail Infrastructure Construction Output Value, Demolition (US$ Million), 2021 - 2026
Table 37: Australia Rail Infrastructure Construction Output, Demolition by Cost Component (AUD Million), 2017 - 2021
Table 38: Australia Rail Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2017 - 2021
Table 39: Australia Rail Infrastructure Construction Output, Demolition by Cost Component (AUD Million), 2022 - 2026
Table 40: Australia Rail Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2022 - 2026
Table 41: GlobalData - Rail Infrastructure Construction Market Definitions
Table 42: Exchange Rate, 2017 - 2021
Table 43: Exchange Rate, 2022 - 2026 Forecast
List of Figures
Figure 1: Australia Rail Infrastructure Construction Output Value (AUD Million), 2017 - 2021
Figure 2: Australia Rail Infrastructure Construction Output Value (AUD Million), 2021 - 2026
Figure 3: Australia Rail Infrastructure Construction Output, by Cost Component (AUD Million), 2017 - 2021
Figure 4: Australia Rail Infrastructure Construction Output, by Cost Component (AUD Million), 2022 - 2026
Figure 5: Australia Rail Infrastructure Construction Output Value, New Construction (AUD Million), 2017 - 2021
Figure 6: Australia Rail Infrastructure Construction Output Value, New Construction (AUD Million), 2021 - 2026
Figure 7: Australia Rail Infrastructure Construction Output, New Construction by Cost Component (AUD Million), 2017 - 2021
Figure 8: Australia Rail Infrastructure Construction Output, New Construction by Cost Component (AUD Million), 2022 - 2026
Figure 9: Australia Rail Infrastructure Construction Output Value, Repair and Maintenance (AUD Million), 2017 - 2021
Figure 10: Australia Rail Infrastructure Construction Output Value, Repair and Maintenance (AUD Million), 2021- 2026
Figure 11: Australia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (AUD Million), 2017 - 2021
Figure 12: Australia Rail Infrastructure Construction Output, Repair and Maintenance by Cost Component (AUD Million), 2022 - 2026
Figure 13: Australia Rail Infrastructure Construction Output Value, Refurbishment (AUD Million), 2017 - 2021
Figure 14: Australia Rail Infrastructure Construction Output Value, Refurbishment (AUD Million), 2021- 2026
Figure 15: Australia Rail Infrastructure Construction Output, Refurbishment by Cost Component (AUD Million), 2017 - 2021
Figure 16: Australia Rail Infrastructure Construction Output, Refurbishment by Cost Component (AUD Million), 2022 - 2026
Figure 17: Australia Rail Infrastructure Construction Output Value, Demolition (AUD Million), 2017 - 2021
Figure 18: Australia Rail Infrastructure Construction Output Value, Demolition (AUD Million), 2021 - 2026
Figure 19: Australia Rail Infrastructure Construction Output, Demolition by Cost Component (AUD Million), 2017 - 2021
Figure 20: Australia Rail Infrastructure Construction Output, Demolition by Cost Component (AUD Million), 2022 - 2026

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook
Cookie Settings