Infrastructure Construction Market in Bahrain - Market Size and Forecasts to 2026

Infrastructure Construction Market in Bahrain - Market Size and Forecasts to 2026

Summary

The infrastructure construction sector of Bahrain registered a positive compound annual growth rate (CAGR) of 1.88% during the period 2017 to 2021 with an output value of BHD529.58 million in 2021, an increase of0.83% over 2020. The sector achieved its strongest performance in 2019 when it grew by 3.26% over the previous year and its weakest performance in 2017, when it decreased by 6.77% over 2016.

Infrastructure Construction Market in Bahrain - Market Size and Forecasts to 2026 is a broad level market review of Infrastructure Construction market in Bahrain.

Heavy infrastructure construction projects including, but not limited to, highways, bridges, tunnels, dams, dikes, subways, and other mass transit projects. For reporting purposes, the market is split into three main categories: rail infrastructure, road infrastructure, and other infrastructure projects. .

This research handbook provides historic and forecast market data for the Infrastructure Construction market in Bahrain, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026.

This report also provides a top-level overview and detailed insight into the operating environment of the Infrastructure Construction market in Bahrain. It is an essential tool for companies active across the Bahrain construction value chain and for new players considering to enter the market.

Values in the handbook are depicted in USD ($) and local currency of the country.

*Note: Certain content / sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope

  • Overview of the infrastructure construction market in Bahrain.
  • Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided.
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the infrastructure construction market and the data is provided for both historic and forecast periods.
Reasons to Buy
  • Enhances your knowledge of the market with key figures detailing construction type.
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
  • Allows you to plan future business decisions using the forecast figures given.
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.


1 Executive Summary
2 Infrastructure Construction: Market Analytics
2.1 Infrastructure Construction Output Value, 2017 - 2021
2.2 Infrastructure Construction Output Value Forecast, 2021 - 2026
2.3 Infrastructure Construction Output, by Cost Component
2.3.1 Infrastructure Construction Output, by Cost Component, 2017 - 2021
2.3.2 Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
3 Infrastructure Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 - 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Road Infrastructure Construction: Market Analytics
4.1 Road Infrastructure Construction Output Value, 2017 - 2021
4.2 Road Infrastructure Construction Output Value Forecast, 2021 - 2026
4.3 Road Infrastructure Construction Output, by Cost Component
4.3.1 Road Infrastructure Construction Output, by Cost Component, 2017 - 2021
4.3.2 Road Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
5 Appendix
5.1 Definitions
5.2 CAGR Definition and Calculation
5.3 Exchange Rates
5.4 Methodology
5.5 About GlobalData
5.6 Disclaimer
List of Tables
Table 1: Bahrain Infrastructure Construction Output Value (BHD Million), 2017 - 2021
Table 2: Bahrain Infrastructure Construction Output Value (US$ Million), 2017 - 2021
Table 3: Bahrain Infrastructure Construction Output Value (BHD Million), 2021 - 2026
Table 4: Bahrain Infrastructure Construction Output Value (US$ Million), 2021 - 2026
Table 5: Bahrain Infrastructure Construction Output, by Cost Component (BHD Million), 2017 - 2021
Table 6: Bahrain Infrastructure Construction Output, by Cost Component (US$ Million), 2017 - 2021
Table 7: Bahrain Infrastructure Construction Output, by Cost Component (BHD Million), 2022 - 2026
Table 8: Bahrain Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 9: Bahrain Infrastructure Construction Output Value, New Construction (BHD Million), 2017 - 2021
Table 10: Bahrain Infrastructure Construction Output Value, New Construction (US$ Million), 2017 - 2021
Table 11: Bahrain Infrastructure Construction Output Value, New Construction (BHD Million), 2021- 2026
Table 12: Bahrain Infrastructure Construction Output Value, New Construction (US$ Million), 2021- 2026
Table 13: Bahrain Infrastructure Construction Output, New Construction by Cost Component (BHD Million), 2017 - 2021
Table 14: Bahrain Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2017 - 2021
Table 15: Bahrain Infrastructure Construction Output, New Construction by Cost Component (BHD Million), 2022 - 2026
Table 16: Bahrain Infrastructure Construction Output, New Construction by Cost Component (US$ Million), 2022 - 2026
Table 17: Bahrain Infrastructure Construction Output Value, Repair and Maintenance (BHD Million), 2017 - 2021
Table 18: Bahrain Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2017 - 2021
Table 19: Bahrain Infrastructure Construction Output Value, Repair and Maintenance (BHD Million), 2021 - 2026
Table 20: Bahrain Infrastructure Construction Output Value, Repair and Maintenance (US$ Million), 2021 - 2026
Table 21: Bahrain Infrastructure Construction Output, Repair and Maintenance by Cost Component (BHD Million), 2017 - 2021
Table 22: Bahrain Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2017 - 2021
Table 23: Bahrain Infrastructure Construction Output, Repair and Maintenance by Cost Component (BHD Million), 2022 - 2026
Table 24: Bahrain Infrastructure Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2022 - 2026
Table 25: Bahrain Infrastructure Construction Output Value, Refurbishment (BHD Million), 2017 - 2021
Table 26: Bahrain Infrastructure Construction Output Value, Refurbishment (US$ Million), 2017 - 2021
Table 27: Bahrain Infrastructure Construction Output Value, Refurbishment (BHD Million), 2021 - 2026
Table 28: Bahrain Infrastructure Construction Output Value, Refurbishment (US$ Million), 2021- 2026
Table 29: Bahrain Infrastructure Construction Output, Refurbishment by Cost Component (BHD Million), 2017 - 2021
Table 30: Bahrain Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2017 - 2021
Table 31: Bahrain Infrastructure Construction Output, Refurbishment by Cost Component (BHD Million), 2022 - 2026
Table 32: Bahrain Infrastructure Construction Output, Refurbishment by Cost Component (US$ Million), 2022 - 2026
Table 33: Bahrain Infrastructure Construction Output Value, Demolition (BHD Million), 2017 - 2021
Table 34: Bahrain Infrastructure Construction Output Value, Demolition (US$ Million), 2017 - 2021
Table 35: Bahrain Infrastructure Construction Output Value, Demolition (BHD Million), 2021 - 2026
Table 36: Bahrain Infrastructure Construction Output Value, Demolition (US$ Million), 2021 - 2026
Table 37: Bahrain Infrastructure Construction Output, Demolition by Cost Component (BHD Million), 2017 - 2021
Table 38: Bahrain Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2017 - 2021
Table 39: Bahrain Infrastructure Construction Output, Demolition by Cost Component (BHD Million), 2022 - 2026
Table 40: Bahrain Infrastructure Construction Output, Demolition by Cost Component (US$ Million), 2022 - 2026
Table 41: Bahrain Road Infrastructure Construction Output Value (BHD Million), 2017 - 2021
Table 42: Bahrain Road Infrastructure Construction Output Value (US$ Million), 2017 - 2021
Table 43: Bahrain Road Infrastructure Construction Output Value (BHD Million), 2021 - 2026
Table 44: Bahrain Road Infrastructure Construction Output Value (US$ Million), 2021 - 2026
Table 45: Bahrain Road Infrastructure Construction Output, by Cost Component (BHD Million), 2017 - 2021
Table 46: Bahrain Road Infrastructure Construction Output, by Cost Component (US$ Million), 2017 - 2021
Table 47: Bahrain Road Infrastructure Construction Output, by Cost Component (BHD Million), 2022 - 2026
Table 48: Bahrain Road Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 49: GlobalData - Infrastructure Construction Market Definitions
Table 50: Exchange Rate, 2017 - 2021
Table 51: Exchange Rate, 2022 - 2026 Forecast
List of Figures
Figure 1: Bahrain Infrastructure Construction Output Value (BHD Million), 2017 - 2021
Figure 2: Bahrain Infrastructure Construction Output Value (BHD Million), 2021 - 2026
Figure 3: Bahrain Infrastructure Construction Output, by Cost Component (BHD Million), 2017 - 2021
Figure 4: Bahrain Infrastructure Construction Output, by Cost Component (BHD Million), 2022 - 2026
Figure 5: Bahrain Infrastructure Construction Output Value, New Construction (BHD Million), 2017 - 2021
Figure 6: Bahrain Infrastructure Construction Output Value, New Construction (BHD Million), 2021 - 2026
Figure 7: Bahrain Infrastructure Construction Output, New Construction by Cost Component (BHD Million), 2017 - 2021
Figure 8: Bahrain Infrastructure Construction Output, New Construction by Cost Component (BHD Million), 2022 - 2026
Figure 9: Bahrain Infrastructure Construction Output Value, Repair and Maintenance (BHD Million), 2017 - 2021
Figure 10: Bahrain Infrastructure Construction Output Value, Repair and Maintenance (BHD Million), 2021- 2026
Figure 11: Bahrain Infrastructure Construction Output, Repair and Maintenance by Cost Component (BHD Million), 2017 - 2021
Figure 12: Bahrain Infrastructure Construction Output, Repair and Maintenance by Cost Component (BHD Million), 2022 - 2026
Figure 13: Bahrain Infrastructure Construction Output Value, Refurbishment (BHD Million), 2017 - 2021
Figure 14: Bahrain Infrastructure Construction Output Value, Refurbishment (BHD Million), 2021- 2026
Figure 15: Bahrain Infrastructure Construction Output, Refurbishment by Cost Component (BHD Million), 2017 - 2021
Figure 16: Bahrain Infrastructure Construction Output, Refurbishment by Cost Component (BHD Million), 2022 - 2026
Figure 17: Bahrain Infrastructure Construction Output Value, Demolition (BHD Million), 2017 - 2021
Figure 18: Bahrain Infrastructure Construction Output Value, Demolition (BHD Million), 2021 - 2026
Figure 19: Bahrain Infrastructure Construction Output, Demolition by Cost Component (BHD Million), 2017 - 2021
Figure 20: Bahrain Infrastructure Construction Output, Demolition by Cost Component (BHD Million), 2022 - 2026
Figure 21: Bahrain Road Infrastructure Construction Output Value (BHD Million), 2017 - 2021
Figure 22: Bahrain Road Infrastructure Construction Output Value (BHD Million), 2021 - 2026
Figure 23: Bahrain Road Infrastructure Construction Output, by Cost Component (BHD Million), 2017 - 2021
Figure 24: Bahrain Road Infrastructure Construction Output, by Cost Component (BHD Million), 2022 - 2026

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook
Cookie Settings