Energy and Utilities Construction Market in Egypt - Market Size and Forecasts to 2026

Energy and Utilities Construction Market in Egypt - Market Size and Forecasts to 2026


Summary

The energy and utilities construction sector of Egypt registered a positive compound annual growth rate (CAGR) of 28.37% during the period 2017 to 2021 with an output value of EGP248,684.53 million in 2021, an increase of16.57% over 2020. The sector achieved its strongest performance in 2021 when it grew by 16.57% over the previous year and its weakest performance in 2017, when it decreased by 57.67% over 2016.

Energy and Utilities Construction Market in Egypt - Market Size and Forecasts to 2026 is a broad level market review of Energy and Utilities Construction market in Egypt.

Energy and telecommunications-related projects, oil and gas projects including upstream and downstream exploration, and utility projects such as water and sewage infrastructure. For reporting purposes, the market is split into five main categories: electricity and power, oil and gas, telecommunications, sewage infrastructure and water infrastructure. .

This research handbook provides historic and forecast market data for the Energy and Utilities Construction market in Egypt, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026.

This report also provides a top-level overview and detailed insight into the operating environment of the Energy and Utilities Construction market in Egypt. It is an essential tool for companies active across the Egypt construction value chain and for new players considering to enter the market.

Values in the handbook are depicted in USD ($) and local currency of the country.

*Note: Certain content / sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope
  • Overview of the energy and utilities construction market in Egypt.
  • Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided.
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the energy and utilities construction market and the data is provided for both historic and forecast periods.
Reasons to Buy
  • Enhances your knowledge of the market with key figures detailing construction type.
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
  • Allows you to plan future business decisions using the forecast figures given.
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.


1 Executive Summary
2 Energy and Utilities Construction: Market Analytics
2.1 Energy and Utilities Construction Output Value, 2017 - 2021
2.2 Energy and Utilities Construction Output Value Forecast, 2021 - 2026
2.3 Energy and Utilities Construction Output, by Cost Component
2.3.1 Energy and Utilities Construction Output, by Cost Component, 2017 - 2021
2.3.2 Energy and Utilities Construction Output Forecast, by Cost Component, 2022 - 2026
3 Energy and Utilities Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 – 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Electricity and Power Construction: Market Analytics
4.1 Electricity and Power Construction Output Value, 2017 - 2021
4.2 Electricity and Power Construction Output Value Forecast, 2021 - 2026
4.3 Electricity and Power Construction Output, by Cost Component
4.3.1 Electricity and Power Construction Output, by Cost Component, 2017 - 2021
4.3.2 Electricity and Power Construction Output Forecast, by Cost Component, 2022 - 2026
5 Oil and Gas Construction: Market Analytics
5.1 Oil and Gas Construction Output Value, 2017 - 2021
5.2 Oil and Gas Construction Output Value Forecast, 2021 - 2026
5.3 Oil and Gas Construction Output, by Cost Component
5.3.1 Oil and Gas Construction Output, by Cost Component, 2017 - 2021
5.3.2 Oil and Gas Construction Output Forecast, by Cost Component, 2022 - 2026
6 Telecommunications Construction: Market Analytics
6.1 Telecommunications Construction Output Value, 2017 - 2021
6.2 Telecommunications Construction Output Value Forecast, 2021 - 2026
6.3 Telecommunications Construction Output, by Cost Component
6.3.1 Telecommunications Construction Output, by Cost Component, 2017 - 2021
6.3.2 Telecommunications Construction Output Forecast, by Cost Component, 2022 - 2026
7 Sewage Infrastructure Construction: Market Analytics
7.1 Sewage Infrastructure Construction Output Value, 2017 - 2021
7.2 Sewage Infrastructure Construction Output Value Forecast, 2021 - 2026
7.3 Sewage Infrastructure Construction Output, by Cost Component
7.3.1 Sewage Infrastructure Construction Output, by Cost Component, 2017 - 2021
7.3.2 Sewage Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
8 Water Infrastructure Construction: Market Analytics
8.1 Water Infrastructure Construction Output Value, 2017 - 2021
8.2 Water Infrastructure Construction Output Value Forecast, 2021 - 2026
8.3 Water Infrastructure Construction Output, by Cost Component
8.3.1 Water Infrastructure Construction Output, by Cost Component, 2017 - 2021
8.3.2 Water Infrastructure Construction Output Forecast, by Cost Component, 2022 - 2026
9 Appendix
9.1 Definitions
9.2 CAGR Definition and Calculation
9.3 Exchange Rates
9.4 Methodology
9.5 About GlobalData
9.6 Disclaimer
List of Tables
Table 1: Egypt Energy and Utilities Construction Output Value (EGP Million), 2017 - 2021
Table 2: Egypt Energy and Utilities Construction Output Value (US$ Million), 2017 - 2021
Table 3: Egypt Energy and Utilities Construction Output Value (EGP Million), 2021 - 2026
Table 4: Egypt Energy and Utilities Construction Output Value (US$ Million), 2021 - 2026
Table 5: Egypt Energy and Utilities Construction Output, by Cost Component (EGP Million), 2017 – 2021
Table 6: Egypt Energy and Utilities Construction Output, by Cost Component (US$ Million), 2017 – 2021
Table 7: Egypt Energy and Utilities Construction Output, by Cost Component (EGP Million), 2022 - 2026
Table 8: Egypt Energy and Utilities Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 9: Egypt Energy and Utilities Construction Output Value, New Construction (EGP Million), 2017 - 2021
Table 10: Egypt Energy and Utilities Construction Output Value, New Construction (US$ Million), 2017 - 2021
Table 11: Egypt Energy and Utilities Construction Output Value, New Construction (EGP Million), 2021- 2026
Table 12: Egypt Energy and Utilities Construction Output Value, New Construction (US$ Million), 2021- 2026
Table 13: Egypt Energy and Utilities Construction Output, New Construction by Cost Component (EGP Million), 2017 - 2021
Table 14: Egypt Energy and Utilities Construction Output, New Construction by Cost Component (US$ Million), 2017 - 2021
Table 15: Egypt Energy and Utilities Construction Output, New Construction by Cost Component (EGP Million), 2022 - 2026
Table 16: Egypt Energy and Utilities Construction Output, New Construction by Cost Component (US$ Million), 2022 - 2026
Table 17: Egypt Energy and Utilities Construction Output Value, Repair and Maintenance (EGP Million), 2017 - 2021
Table 18: Egypt Energy and Utilities Construction Output Value, Repair and Maintenance (US$ Million), 2017 - 2021
Table 19: Egypt Energy and Utilities Construction Output Value, Repair and Maintenance (EGP Million), 2021 – 2026
Table 20: Egypt Energy and Utilities Construction Output Value, Repair and Maintenance (US$ Million), 2021 - 2026
Table 21: Egypt Energy and Utilities Construction Output, Repair and Maintenance by Cost Component (EGP Million), 2017 - 2021
Table 22: Egypt Energy and Utilities Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2017 - 2021
Table 23: Egypt Energy and Utilities Construction Output, Repair and Maintenance by Cost Component (EGP Million), 2022 – 2026
Table 24: Egypt Energy and Utilities Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2022 – 2026
Table 25: Egypt Energy and Utilities Construction Output Value, Refurbishment (EGP Million), 2017 - 2021
Table 26: Egypt Energy and Utilities Construction Output Value, Refurbishment (US$ Million), 2017 - 2021
Table 27: Egypt Energy and Utilities Construction Output Value, Refurbishment (EGP Million), 2021 - 2026
Table 28: Egypt Energy and Utilities Construction Output Value, Refurbishment (US$ Million), 2021- 2026
Table 29: Egypt Energy and Utilities Construction Output, Refurbishment by Cost Component (EGP Million), 2017 - 2021
Table 30: Egypt Energy and Utilities Construction Output, Refurbishment by Cost Component (US$ Million), 2017 - 2021
Table 31: Egypt Energy and Utilities Construction Output, Refurbishment by Cost Component (EGP Million), 2022 - 2026
Table 32: Egypt Energy and Utilities Construction Output, Refurbishment by Cost Component (US$ Million), 2022 - 2026
Table 33: Egypt Energy and Utilities Construction Output Value, Demolition (EGP Million), 2017 - 2021
Table 34: Egypt Energy and Utilities Construction Output Value, Demolition (US$ Million), 2017 - 2021
Table 35: Egypt Energy and Utilities Construction Output Value, Demolition (EGP Million), 2021 - 2026
Table 36: Egypt Energy and Utilities Construction Output Value, Demolition (US$ Million), 2021 - 2026
Table 37: Egypt Energy and Utilities Construction Output, Demolition by Cost Component (EGP Million), 2017 - 2021
Table 38: Egypt Energy and Utilities Construction Output, Demolition by Cost Component (US$ Million), 2017 - 2021
Table 39: Egypt Energy and Utilities Construction Output, Demolition by Cost Component (EGP Million), 2022 - 2026
Table 40: Egypt Energy and Utilities Construction Output, Demolition by Cost Component (US$ Million), 2022 - 2026
Table 41: Egypt Electricity and Power Construction Output Value (EGP Million), 2017 - 2021
Table 42: Egypt Electricity and Power Construction Output Value (US$ Million), 2017 - 2021
Table 43: Egypt Electricity and Power Construction Output Value (EGP Million), 2021 - 2026
Table 44: Egypt Electricity and Power Construction Output Value (US$ Million), 2021 - 2026
Table 45: Egypt Electricity and Power Construction Output, by Cost Component (EGP Million), 2017 – 2021
Table 46: Egypt Electricity and Power Construction Output, by Cost Component (US$ Million), 2017 – 2021
Table 47: Egypt Electricity and Power Construction Output, by Cost Component (EGP Million), 2022 - 2026
Table 48: Egypt Electricity and Power Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 49: Egypt Oil and Gas Construction Output Value (EGP Million), 2017 - 2021
Table 50: Egypt Oil and Gas Construction Output Value (US$ Million), 2017 - 2021
Table 51: Egypt Oil and Gas Construction Output Value (EGP Million), 2021 - 2026
Table 52: Egypt Oil and Gas Construction Output Value (US$ Million), 2021 - 2026
Table 53: Egypt Oil and Gas Construction Output, by Cost Component (EGP Million), 2017 – 2021
Table 54: Egypt Oil and Gas Construction Output, by Cost Component (US$ Million), 2017 – 2021
Table 55: Egypt Oil and Gas Construction Output, by Cost Component (EGP Million), 2022 - 2026
Table 56: Egypt Oil and Gas Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 57: Egypt Telecommunications Construction Output Value (EGP Million), 2017 - 2021
Table 58: Egypt Telecommunications Construction Output Value (US$ Million), 2017 - 2021
Table 59: Egypt Telecommunications Construction Output Value (EGP Million), 2021 - 2026
Table 60: Egypt Telecommunications Construction Output Value (US$ Million), 2021 - 2026
Table 61: Egypt Telecommunications Construction Output, by Cost Component (EGP Million), 2017 – 2021
Table 62: Egypt Telecommunications Construction Output, by Cost Component (US$ Million), 2017 – 2021
Table 63: Egypt Telecommunications Construction Output, by Cost Component (EGP Million), 2022 - 2026
Table 64: Egypt Telecommunications Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 65: Egypt Sewage Infrastructure Construction Output Value (EGP Million), 2017 - 2021
Table 66: Egypt Sewage Infrastructure Construction Output Value (US$ Million), 2017 - 2021
Table 67: Egypt Sewage Infrastructure Construction Output Value (EGP Million), 2021 - 2026
Table 68: Egypt Sewage Infrastructure Construction Output Value (US$ Million), 2021 - 2026
Table 69: Egypt Sewage Infrastructure Construction Output, by Cost Component (EGP Million), 2017 – 2021
Table 70: Egypt Sewage Infrastructure Construction Output, by Cost Component (US$ Million), 2017 – 2021
Table 71: Egypt Sewage Infrastructure Construction Output, by Cost Component (EGP Million), 2022 - 2026
Table 72: Egypt Sewage Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 73: Egypt Water Infrastructure Construction Output Value (EGP Million), 2017 - 2021
Table 74: Egypt Water Infrastructure Construction Output Value (US$ Million), 2017 - 2021
Table 75: Egypt Water Infrastructure Construction Output Value (EGP Million), 2021 - 2026
Table 76: Egypt Water Infrastructure Construction Output Value (US$ Million), 2021 - 2026
Table 77: Egypt Water Infrastructure Construction Output, by Cost Component (EGP Million), 2017 – 2021
Table 78: Egypt Water Infrastructure Construction Output, by Cost Component (US$ Million), 2017 – 2021
Table 79: Egypt Water Infrastructure Construction Output, by Cost Component (EGP Million), 2022 - 2026
Table 80: Egypt Water Infrastructure Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 81: GlobalData – Energy and Utilities Construction Market Definitions
Table 82: Exchange Rate, 2017 - 2021
Table 83: Exchange Rate, 2022 - 2026 Forecast
List of Figures
Figure 1: Egypt Energy and Utilities Construction Output Value (EGP Million), 2017 – 2021
Figure 2: Egypt Energy and Utilities Construction Output Value (EGP Million), 2021 – 2026
Figure 3: Egypt Energy and Utilities Construction Output, by Cost Component (EGP Million), 2017 - 2021
Figure 4: Egypt Energy and Utilities Construction Output, by Cost Component (EGP Million), 2022 - 2026
Figure 5: Egypt Energy and Utilities Construction Output Value, New Construction (EGP Million), 2017 - 2021
Figure 6: Egypt Energy and Utilities Construction Output Value, New Construction (EGP Million), 2021 - 2026
Figure 7: Egypt Energy and Utilities Construction Output, New Construction by Cost Component (EGP Million), 2017 - 2021
Figure 8: Egypt Energy and Utilities Construction Output, New Construction by Cost Component (EGP Million), 2022 - 2026
Figure 9: Egypt Energy and Utilities Construction Output Value, Repair and Maintenance (EGP Million), 2017 - 2021
Figure 10: Egypt Energy and Utilities Construction Output Value, Repair and Maintenance (EGP Million), 2021- 2026
Figure 11: Egypt Energy and Utilities Construction Output, Repair and Maintenance by Cost Component (EGP Million), 2017 - 2021
Figure 12: Egypt Energy and Utilities Construction Output, Repair and Maintenance by Cost Component (EGP Million), 2022 – 2026
Figure 13: Egypt Energy and Utilities Construction Output Value, Refurbishment (EGP Million), 2017 - 2021
Figure 14: Egypt Energy and Utilities Construction Output Value, Refurbishment (EGP Million), 2021- 2026
Figure 15: Egypt Energy and Utilities Construction Output, Refurbishment by Cost Component (EGP Million), 2017 - 2021
Figure 16: Egypt Energy and Utilities Construction Output, Refurbishment by Cost Component (EGP Million), 2022 - 2026
Figure 17: Egypt Energy and Utilities Construction Output Value, Demolition (EGP Million), 2017 - 2021
Figure 18: Egypt Energy and Utilities Construction Output Value, Demolition (EGP Million), 2021 - 2026
Figure 19: Egypt Energy and Utilities Construction Output, Demolition by Cost Component (EGP Million), 2017 - 2021
Figure 20: Egypt Energy and Utilities Construction Output, Demolition by Cost Component (EGP Million), 2022 - 2026
Figure 21: Egypt Electricity and Power Construction Output Value (EGP Million), 2017 – 2021
Figure 22: Egypt Electricity and Power Construction Output Value (EGP Million), 2021 – 2026
Figure 23: Egypt Electricity and Power Construction Output, by Cost Component (EGP Million), 2017 - 2021
Figure 24: Egypt Electricity and Power Construction Output, by Cost Component (EGP Million), 2022 - 2026
Figure 25: Egypt Oil and Gas Construction Output Value (EGP Million), 2017 – 2021
Figure 26: Egypt Oil and Gas Construction Output Value (EGP Million), 2021 – 2026
Figure 27: Egypt Oil and Gas Construction Output, by Cost Component (EGP Million), 2017 - 2021
Figure 28: Egypt Oil and Gas Construction Output, by Cost Component (EGP Million), 2022 - 2026
Figure 29: Egypt Telecommunications Construction Output Value (EGP Million), 2017 – 2021
Figure 30: Egypt Telecommunications Construction Output Value (EGP Million), 2021 – 2026
Figure 31: Egypt Telecommunications Construction Output, by Cost Component (EGP Million), 2017 - 2021
Figure 32: Egypt Telecommunications Construction Output, by Cost Component (EGP Million), 2022 - 2026
Figure 33: Egypt Sewage Infrastructure Construction Output Value (EGP Million), 2017 – 2021
Figure 34: Egypt Sewage Infrastructure Construction Output Value (EGP Million), 2021 – 2026
Figure 35: Egypt Sewage Infrastructure Construction Output, by Cost Component (EGP Million), 2017 - 2021
Figure 36: Egypt Sewage Infrastructure Construction Output, by Cost Component (EGP Million), 2022 - 2026
Figure 37: Egypt Water Infrastructure Construction Output Value (EGP Million), 2017 – 2021
Figure 38: Egypt Water Infrastructure Construction Output Value (EGP Million), 2021 – 2026
Figure 39: Egypt Water Infrastructure Construction Output, by Cost Component (EGP Million), 2017 - 2021
Figure 40: Egypt Water Infrastructure Construction Output, by Cost Component (EGP Million), 2022 - 2026

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook
Cookie Settings