Electricity and Power Construction Market in Malaysia - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)
Electricity and Power Construction Market in Malaysia - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)
Summary
The electricity and power construction sector in Malaysia registered a Compound Annual Rate of Change (CARC) of -3.09% during the period 2017 to 2021 with an output value of MYR6,633.59 million in 2021, an increase of8.18% over 2020. The sector achieved its strongest performance in 2017 when it grew by 22.02% over the previous year and its weakest performance in 2020, when it decreased by 23.25% over 2019.
Electricity and Power Construction Market in Malaysia - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Electricity and Power construction market in Malaysia.
Buildings for power generation and transmission, and electrical transmission infrastructure including the laying and installation of cables, pipes and transmitting towers. .
This research handbook provides historic and forecast market data for the Electricity and Power construction market in Malaysia, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026.
This report also provides a top-level overview and detailed insight into the operating environment of the Electricity and Power construction market in Malaysia. It is an essential tool for companies active across the Malaysia construction value chain and for new players considering to enter the market.
Values in the handbook are depicted in USD ($) and local currency of the country.
*Note:Certain content / sections in the research handbook may be removed or altered based on the availability and relevance of data.
Scope
Overview of the electricity and power construction market in Malaysia.
Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided.
A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the electricity and power market and the data is provided for both historic and forecast periods.
Reasons to Buy
Enhances your knowledge of the market with key figures detailing construction type.
Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
Allows you to plan future business decisions using the forecast figures given.
The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.
1 Executive Summary
2 Electricity and Power Construction: Market Analytics
2.1 Electricity and Power Construction Output Value, 2017 - 2021
2.2 Electricity and Power Construction Output Value Forecast, 2021 - 2026
2.3 Electricity and Power Construction Output, by Cost Component
2.3.1 Electricity and Power Construction Output, by Cost Component, 2017 - 2021
2.3.2 Electricity and Power Construction Output Forecast, by Cost Component, 2022 - 2026
3 Electricity and Power Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 – 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About GlobalData
4.6 Disclaimer
List of Tables
Table 1: Malaysia Electricity and Power Construction Output Value (MYR Million), 2017 - 2021
Table 2: Malaysia Electricity and Power Construction Output Value (US$ Million), 2017 - 2021
Table 3: Malaysia Electricity and Power Construction Output Value (MYR Million), 2021 - 2026
Table 4: Malaysia Electricity and Power Construction Output Value (US$ Million), 2021 - 2026
Table 5: Malaysia Electricity and Power Construction Output, by Cost Component (MYR Million), 2017 – 2021
Table 6: Malaysia Electricity and Power Construction Output, by Cost Component (US$ Million), 2017 – 2021
Table 7: Malaysia Electricity and Power Construction Output, by Cost Component (MYR Million), 2022 - 2026
Table 8: Malaysia Electricity and Power Construction Output, by Cost Component (US$ Million), 2022 - 2026
Table 9: Malaysia Electricity and Power Construction Output Value, New Construction (MYR Million), 2017 - 2021
Table 10: Malaysia Electricity and Power Construction Output Value, New Construction (US$ Million), 2017 - 2021
Table 11: Malaysia Electricity and Power Construction Output Value, New Construction (MYR Million), 2021- 2026
Table 12: Malaysia Electricity and Power Construction Output Value, New Construction (US$ Million), 2021- 2026
Table 13: Malaysia Electricity and Power Construction Output, New Construction by Cost Component (MYR Million), 2017 - 2021
Table 14: Malaysia Electricity and Power Construction Output, New Construction by Cost Component (US$ Million), 2017 - 2021
Table 15: Malaysia Electricity and Power Construction Output, New Construction by Cost Component (MYR Million), 2022 - 2026
Table 16: Malaysia Electricity and Power Construction Output, New Construction by Cost Component (US$ Million), 2022 - 2026
Table 17: Malaysia Electricity and Power Construction Output Value, Repair and Maintenance (MYR Million), 2017 - 2021
Table 18: Malaysia Electricity and Power Construction Output Value, Repair and Maintenance (US$ Million), 2017 - 2021
Table 19: Malaysia Electricity and Power Construction Output Value, Repair and Maintenance (MYR Million), 2021 – 2026
Table 20: Malaysia Electricity and Power Construction Output Value, Repair and Maintenance (US$ Million), 2021 - 2026
Table 21: Malaysia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (MYR Million), 2017 - 2021
Table 22: Malaysia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2017 - 2021
Table 23: Malaysia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (MYR Million), 2022 – 2026
Table 24: Malaysia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (US$ Million), 2022 – 2026
Table 25: Malaysia Electricity and Power Construction Output Value, Refurbishment (MYR Million), 2017 - 2021
Table 26: Malaysia Electricity and Power Construction Output Value, Refurbishment (US$ Million), 2017 - 2021
Table 27: Malaysia Electricity and Power Construction Output Value, Refurbishment (MYR Million), 2021 - 2026
Table 28: Malaysia Electricity and Power Construction Output Value, Refurbishment (US$ Million), 2021- 2026
Table 29: Malaysia Electricity and Power Construction Output, Refurbishment by Cost Component (MYR Million), 2017 - 2021
Table 30: Malaysia Electricity and Power Construction Output, Refurbishment by Cost Component (US$ Million), 2017 - 2021
Table 31: Malaysia Electricity and Power Construction Output, Refurbishment by Cost Component (MYR Million), 2022 - 2026
Table 32: Malaysia Electricity and Power Construction Output, Refurbishment by Cost Component (US$ Million), 2022 - 2026
Table 33: Malaysia Electricity and Power Construction Output Value, Demolition (MYR Million), 2017 - 2021
Table 34: Malaysia Electricity and Power Construction Output Value, Demolition (US$ Million), 2017 - 2021
Table 35: Malaysia Electricity and Power Construction Output Value, Demolition (MYR Million), 2021 - 2026
Table 36: Malaysia Electricity and Power Construction Output Value, Demolition (US$ Million), 2021 - 2026
Table 37: Malaysia Electricity and Power Construction Output, Demolition by Cost Component (MYR Million), 2017 - 2021
Table 38: Malaysia Electricity and Power Construction Output, Demolition by Cost Component (US$ Million), 2017 - 2021
Table 39: Malaysia Electricity and Power Construction Output, Demolition by Cost Component (MYR Million), 2022 - 2026
Table 40: Malaysia Electricity and Power Construction Output, Demolition by Cost Component (US$ Million), 2022 - 2026
Table 41: GlobalData – Electricity and Power Construction Market Definitions
Table 42: Exchange Rate, 2017 - 2021
Table 43: Exchange Rate, 2022 - 2026 Forecast
List of Figures
Figure 1: Malaysia Electricity and Power Construction Output Value (MYR Million), 2017 – 2021
Figure 2: Malaysia Electricity and Power Construction Output Value (MYR Million), 2021 – 2026
Figure 3: Malaysia Electricity and Power Construction Output, by Cost Component (MYR Million), 2017 - 2021
Figure 4: Malaysia Electricity and Power Construction Output, by Cost Component (MYR Million), 2022 - 2026
Figure 5: Malaysia Electricity and Power Construction Output Value, New Construction (MYR Million), 2017 - 2021
Figure 6: Malaysia Electricity and Power Construction Output Value, New Construction (MYR Million), 2021 - 2026
Figure 7: Malaysia Electricity and Power Construction Output, New Construction by Cost Component (MYR Million), 2017 - 2021
Figure 8: Malaysia Electricity and Power Construction Output, New Construction by Cost Component (MYR Million), 2022 - 2026
Figure 9: Malaysia Electricity and Power Construction Output Value, Repair and Maintenance (MYR Million), 2017 - 2021
Figure 10: Malaysia Electricity and Power Construction Output Value, Repair and Maintenance (MYR Million), 2021- 2026
Figure 11: Malaysia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (MYR Million), 2017 - 2021
Figure 12: Malaysia Electricity and Power Construction Output, Repair and Maintenance by Cost Component (MYR Million), 2022 – 2026
Figure 13: Malaysia Electricity and Power Construction Output Value, Refurbishment (MYR Million), 2017 - 2021
Figure 14: Malaysia Electricity and Power Construction Output Value, Refurbishment (MYR Million), 2021- 2026
Figure 15: Malaysia Electricity and Power Construction Output, Refurbishment by Cost Component (MYR Million), 2017 - 2021
Figure 16: Malaysia Electricity and Power Construction Output, Refurbishment by Cost Component (MYR Million), 2022 - 2026
Figure 17: Malaysia Electricity and Power Construction Output Value, Demolition (MYR Million), 2017 - 2021
Figure 18: Malaysia Electricity and Power Construction Output Value, Demolition (MYR Million), 2021 - 2026
Figure 19: Malaysia Electricity and Power Construction Output, Demolition by Cost Component (MYR Million), 2017 - 2021
Figure 20: Malaysia Electricity and Power Construction Output, Demolition by Cost Component (MYR Million), 2022 - 2026