Electricity and Power Construction Market in Algeria - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

Electricity and Power Construction Market in Algeria - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs)

Summary

The electricity and power construction sector in Algeria registered a positive Compound Annual Growth Rate (CAGR) of 28.72% during the period 2017 to 2021 with an output value of DZD228,424.44 million in 2021, a decrease of 10.88% over 2020. The sector achieved its strongest performance in 2018 when it grew by 46.73% over the previous year and its weakest performance in 2021, when it decreased by 10.88% over 2020. Electricity and Power Construction Market in Algeria - Market Size and Forecasts to 2026 (including New Construction, Repair and Maintenance, Refurbishment and Demolition and Materials, Equipment and Services costs) is a broad level market review of Electricity and Power construction market in Algeria.Buildings for power generation and transmission, and electrical transmission infrastructure including the laying and installation of cables, pipes and transmitting towers. . This research handbook provides historic and forecast market data for the Electricity and Power construction market in Algeria, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type (construction materials, construction equipment and construction services). It provides up-to-date market size data for the period 2017-2021 and an illustrative forecast to 2026. This report also provides a top-level overview and detailed insight into the operating environment of the Electricity and Power construction market in Algeria. It is an essential tool for companies active across the Algeria construction value chain and for new players considering to enter the market.Values in the handbook are depicted in USD ($) and local currency of the country.*Note: Certain content / sections in the research handbook may be removed or altered based on the availability and relevance of data.

Scope

  • Overview of the electricity and power construction market in Algeria.
  • Historic (2017 through 2021) and forecast (2022 through 2026) construction market output values are provided.
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost types (construction materials, construction equipment and construction services) across the electricity and power market and the data is provided for both historic and forecast periods.
Reasons to Buy
  • Enhances your knowledge of the market with key figures detailing construction type.
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
  • Provides you with a breakdown of the construction market by cost type (construction materials, construction equipment and construction services).
  • Allows you to plan future business decisions using the forecast figures given.
  • The broad but detailed perspective will help all the players in the construction activity to understand and succeed in the challenging construction market.


1 Executive Summary
2 Electricity and Power Construction: Market Analytics
2.1 Electricity and Power Construction Output Value, 2017 - 2021
2.2 Electricity and Power Construction Output Value Forecast, 2021 - 2026
2.3 Electricity and Power Construction Output, by Cost Component
2.3.1 Electricity and Power Construction Output, by Cost Component, 2017 - 2021
2.3.2 Electricity and Power Construction Output Forecast, by Cost Component, 2022 - 2026
3 Electricity and Power Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 - 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About GlobalData
4.6 Disclaimer
1 Executive Summary
2 Electricity and Power Construction: Market Analytics
2.1 Electricity and Power Construction Output Value, 2017 - 2021
2.2 Electricity and Power Construction Output Value Forecast, 2021 - 2026
2.3 Electricity and Power Construction Output, by Cost Component
2.3.1 Electricity and Power Construction Output, by Cost Component, 2017 - 2021
2.3.2 Electricity and Power Construction Output Forecast, by Cost Component, 2022 - 2026
3 Electricity and Power Construction Output: Analysis by Construction Type
3.1 New Construction Output Value, 2017 - 2021
3.2 New Construction Output Value Forecast, 2021 - 2026
3.3 New Construction Output Value by Cost Component
3.3.1 New Construction Output, by Cost Component, 2017 - 2021
3.3.2 New Construction Output Forecast, by Cost Component, 2022 - 2026
3.4 Repair and Maintenance Output Value, 2017 - 2021
3.5 Repair and Maintenance Output value Forecast, 2021- 2026
3.6 Repair and Maintenance Output, by Cost Component
3.6.1 Repair and Maintenance Output, by Cost Component, 2017 - 2021
3.6.2 Repair and Maintenance Output Forecast, by Cost Component, 2022 - 2026
3.7 Refurbishment Construction Output Value, 2017 - 2021
3.8 Refurbishment Construction Output Value Forecast, 2021- 2026
3.9 Refurbishment Construction Output, by Cost Component
3.9.1 Refurbishment Construction Output, by Cost Component, 2017 - 2021
3.9.2 Refurbishment Construction Output Forecast, by Cost Component, 2022 - 2026
3.1 Demolition Construction Output Value, 2017 - 2021
3.11 Demolition Construction Output Value Forecast, 2021- 2026
3.12 Demolition Construction Output, by Cost Component
3.12.1 Demolition Construction Output, by Cost Component, 2017 - 2021
3.12.2 Demolition Construction Output Forecast, by Cost Component, 2022 - 2026
4 Appendix
4.1 Definitions
4.2 CAGR Definition and Calculation
4.3 Exchange Rates
4.4 Methodology
4.5 About GlobalData
4.6 Disclaimer
List of Figures
Figure 1: Algeria Electricity and Power Construction Output Value (DZD Million), 2017 - 2021
Figure 2: Algeria Electricity and Power Construction Output Value (DZD Million), 2021 - 2026
Figure 3: Algeria Electricity and Power Construction Output, by Cost Component (DZD Million), 2017 - 2021
Figure 4: Algeria Electricity and Power Construction Output, by Cost Component (DZD Million), 2022 - 2026
Figure 5: Algeria Electricity and Power Construction Output Value, New Construction (DZD Million), 2017 - 2021
Figure 6: Algeria Electricity and Power Construction Output Value, New Construction (DZD Million), 2021 - 2026
Figure 7: Algeria Electricity and Power Construction Output, New Construction by Cost Component (DZD Million), 2017 - 2021
Figure 8: Algeria Electricity and Power Construction Output, New Construction by Cost Component (DZD Million), 2022 - 2026
Figure 9: Algeria Electricity and Power Construction Output Value, Repair and Maintenance (DZD Million), 2017 - 2021
Figure 10: Algeria Electricity and Power Construction Output Value, Repair and Maintenance (DZD Million), 2021- 2026
Figure 11: Algeria Electricity and Power Construction Output, Repair and Maintenance by Cost Component (DZD Million), 2017 - 2021
Figure 12: Algeria Electricity and Power Construction Output, Repair and Maintenance by Cost Component (DZD Million), 2022 - 2026
Figure 13: Algeria Electricity and Power Construction Output Value, Refurbishment (DZD Million), 2017 - 2021
Figure 14: Algeria Electricity and Power Construction Output Value, Refurbishment (DZD Million), 2021- 2026
Figure 15: Algeria Electricity and Power Construction Output, Refurbishment by Cost Component (DZD Million), 2017 - 2021
Figure 16: Algeria Electricity and Power Construction Output, Refurbishment by Cost Component (DZD Million), 2022 - 2026
Figure 17: Algeria Electricity and Power Construction Output Value, Demolition (DZD Million), 2017 - 2021
Figure 18: Algeria Electricity and Power Construction Output Value, Demolition (DZD Million), 2021 - 2026
Figure 19: Algeria Electricity and Power Construction Output, Demolition by Cost Component (DZD Million), 2017 - 2021
Figure 20: Algeria Electricity and Power Construction Output, Demolition by Cost Component (DZD Million), 2022 - 2026

Download our eBook: How to Succeed Using Market Research

Learn how to effectively navigate the market research process to help guide your organization on the journey to success.

Download eBook
Cookie Settings